our Biodiversity Net Gain services

As specialists in habitat ecology, we develop effective and practicable habitat strategies to achieve BNG.

the BNG process

A desk study and field survey are undertaken to determine the baseline value of a site, and identify constraints and opportunities.

 

Habitats are classified and condition assessed, based on a series of habitat-specific criteria. For watercourses on or within 10 m from a site, an additional MoRPh survey and condition assessment is completed by an accredited surveyor.

 

Survey results are then input to the statutory BNG Metric, which quantifies the biodiversity value of each habitat parcel, and the site as a whole. The Metric calculation considers several characterisitics, including habitat rarity, condition, extent, and significance of location.

Once the baseline biodiversity value of a site has been calculated (Stage 1), the post-development value of the site is determined.


The proposed habitat types and conditions are input to the Metric so that a post-development value can be calculated. This value is then compared to the pre-development value to determine the % Net Gain achieved.

We advise on Net Gain opportunities and constraints, and develop BNG strategies in consultation with the rest of the design team, and stakeholders when necessary. 


If the results of the Metric calculation show that a proposal will not achieve the necessary % Net Gain, we advise on alternative design options. 


For projects with limited on-site opportunities, we develop off-site strategies using other land holdings or Habitat Bank options.

Planning applications should include the BNG assessment and design strategy, along with the Metric.

 

Once consented, Local Authorities also require a Biodiversity Gain Plan (BGP), which details the BNG strategy. The plan should be accompanied by survey reports and the Metric. Some authorities request a draft BGP at application stage. 

 

Consented projects also require a Habitat Management and Monitoring Plan (HMMP), which should cover the initial capital works / establishment phase and a minimum of 30 years management. A draft HMMP may be required at application stage.

 

EcolMon specialises in developing BNG strategies, and produces BNG documents for consultancies, developers, and Habitat Banks.   

BNG schemes require monitoring to inform ongoing management, reduce risk, and confirm compliance to stakeholders.

 

We undertake monitoring of Net Gain sites, consult with landowners, developers and stakeholders to agree practicable remedial measures when necessary, and update HMMPs accordingly. 

A desk study and field survey are undertaken to determine the baseline value of a site, and identify constraints and opportunities.

 

Habitats are classified and condition assessed, based on a series of habitat-specific criteria. For watercourses on or within 10 m from a site, an additional MoRPh survey and condition assessment is completed by an accredited surveyor.

 

Survey results are then input to the statutory BNG Metric, which quantifies the biodiversity value of each habitat parcel, and the site as a whole. The Metric calculation considers several characterisitics, including habitat rarity, condition, extent, and significance of location.

Once the baseline biodiversity value of a site has been calculated (Stage 1), the post-development value of the site is determined.


The proposed habitat types and conditions are input to the Metric, and compared to the pre-development values, to determine the % Net Gain achieved.

We advise on Net Gain opportunities and constraints, and develop BNG strategies in consultation with the rest of your design team, and stakeholders when necessary. 


If the results of the Metric calculation show that a proposal will not achieve the necessary % Net Gain, we advise on alternative design options. 


For projects with limited on site opportunities, we develop off-site strategies using other land holdings or Habitat Bank options.

Local Authorities require planning applications to be accompanied by a Biodiversity Gain Plan, which details the BNG strategy. The plan should be accompanied by survey reports and a BNG Metric.

 

Consented projects require Habitat Management and Monitoring Plans (HMMPs) covering a minimum of 30 years. A draft HMMP may be required for the planning application.

 

We produce all necessary BNG documents to support planning applications, discharge conditions, and register Habitat Banks.    

BNG schemes require monitoring to inform ongoing management and reduce risk, and audits to confirm compliance to stakeholders.

 

We undertake monitoring of Net Gain sites, consult with landowners, developers and stakeholders to agree practicable remedial measures when necessary, and complete audits to confirm compliance.  

We undertake due diligence and technical reviews of BNG strategies and Habitat Management and Monitoring Plans (HMMPs).

 

In addition to assessing the technical content, we advise on deliverability, potential risk and conflicts, including conflicts with agri-environment schemes.  

 

In our supporting role for a national Responsible Body, we have undertaken due diligence reviews of HMMPs for over 60 Habitat Banks to date.  

We undertake due diligence and technical reviews of BNG strategies and Habitat Management and Monitoring Plans (HMMPs) to support the legal process.

 

In addition to assessing the technical content, we advise on deliverability, potential risk and conflicts, including conflicts with agri-environment schemes.  

 

In our supporting role for a national Responsible Body, we have undertaken due diligence reviews of HMMPs for over 50 Habitat Banks to date.  

contact us to discuss your BNG requirements

name *
email *
county *
enquiry *
documents

Max file size (Mb): 2

Max number of files: 1

why EcolMon

60+

BNG strategies and management plans produced or technically reviewed  

7

sectors - agriculture, education, housing & mixed use, recreation, renewable energy, tourism, utilities  

19+

habitat types to create, restore or enhance through BNG strategies produced and reviewed

Jo has been instrumental in helping the Responsible Body stay on track with high demands of sites and to ensure that the ecological due diligence has been robust and comprehensive.

- BNG Responsible Body -